Marten Machining, Inc.
Stevens Point, WI
Delivery Method: Design-Build
Architect: Ellis Construction
Ellis built the original manufacturing facility in 1990, with additions in 1998 and 2006 for a total square footage of 27,400. The 2006 addition included adding an interior crane system to the building. The facility had to be built to exacting standards, including zero vibration and strict temperature and humidity controls.
Related Projects
-
Intevation Food Group, LLC (Infinity)
-
Greenheck Innovation Center
-
Greenheck Health & Wellness Center
-
Pointe Precision
-
Furniture & Appliancemart Distribution Center
-
Dept. of Military Affairs Field Maintenance Shop 13
-
Ki Mobility
-
Greenheck Education Center